Garberville Substation

Garberville Substation Emergency Slope Repair

Garberville, CA

Project Overview


Soil Nails Installed

490

Concrete Poured

450 CY

Excavators Used

Spider

Project Duration

12/2024-Current

Completed

2025


Client

Pacific Gas and Electric Company

Location

Garberville, CA

Emergency Substation Landslide Stabilization & Foundation Reconstruction

Emergency slope stabilization and foundation repair at a PGE substation following a critical landslide event. The project combined geotechnical soil nail installation, slope re-grading, and new TSP foundation construction to restore substation operability and long-term slope stability.

Garberville Substation
Garberville Substation

Full Scope of Work

Slope Stabilization
  • Installation of 490 soil nails for slope retention and stabilization
  • Slope re-grading and re-profiling to reduce future slide risk
  • Drainage improvements integrated into slope repair design
Foundation & Structural Work
  • Construction of new TSP foundation to replace slide-damaged structure
  • 450 CY of concrete poured for foundations and slope facing
  • Structural coordination with PGE substation design engineers
Specialized Equipment
  • All machine work performed using spider (remote-operated) excavators for access on steep slope
  • Spider excavators enabled safe operation on grades impractical for conventional equipment
  • Equipment selection and rigging reviewed by site safety and engineering team
Garberville Substation
Garberville Substation
Garberville Substation
Garberville Substation
Garberville Substation
Garberville Substation
Garberville Substation
Garberville Substation
Garberville Substation
Garberville Substation
Garberville Substation
Garberville Substation
Garberville Substation
Garberville Substation
Garberville Substation
Garberville Substation