PG&E Basin Creek Bridge Repair

PGE Basin Creek Bridge Repair

Remote Northern California

Project Overview


Bridge Decking

125 ft

Man Crew

12

Emergency Response

Fire Damage

Project Duration

9/2025-11/2025

Completed

2025


Client

Pacific Gas and Electric Company

Location

Pine Flat Lake, Fresno County

Emergency Fire-Damaged Bridge Reconstruction & Structural Rehabilitation

Emergency bridge repair following damage sustained during the Garnet Fire. The scope included replacement of bridge decking, structural foundation repairs, and recoating of existing steel components. The remote location and elevated work environment required specialized planning and safety measures.

PG&E Basin Creek Bridge Repair
PG&E Basin Creek Bridge Repair

Full Scope of Work

Structural Repair
  • Construction of new 125-foot bridge decking to replace fire-damaged structure
  • Foundation repairs to restore structural integrity of existing supports
  • Engineering review and documentation of all repaired structural elements
Steel Rehabilitation
  • Recoating of existing bridge steel components for corrosion protection
  • Surface preparation and application of protective coatings per specification
  • Inspection and documentation of coating system for PGE records
Safety & Access
  • Specialized rigging and fall protection systems for elevated work over water
  • 12-person crew trained and equipped for remote high-angle work
  • Remote location logistics including crew transport, equipment staging, and supply management
PG&E Basin Creek Bridge Repair
PG&E Basin Creek Bridge Repair
PG&E Basin Creek Bridge Repair
PG&E Basin Creek Bridge Repair
PG&E Basin Creek Bridge Repair
PG&E Basin Creek Bridge Repair
PG&E Basin Creek Bridge Repair
PG&E Basin Creek Bridge Repair