Round
Mountain Slide

Round Mountain, CA

Project Overview


Project Value

$2.5M

Duration

48 Weeks

Workers

37

Material

20,000 Yards


Client

Summit Ridge Adventures

Location

Round Mountain, CA

Market

Recreation & Adventure Tourism

Key Disciplines

  • Substation
  • Substation & Electrical

500KV Transmission Tower Stabilization & Large-Scale Terrain Reinforcement Effort

Outback’s civil and mechanics teams assisted a design-build project in Yosemite National Park requiring 100% helicopter access throughout the construction process. The remote, steep terrain demanded innovative logistics solutions and strict environmental compliance to protect sensitive park ecosystems.

Full Scope of Work

Foundation Engineering
  • Design and installation of 67 LSP micropile foundations in steep, remote terrain
  • Engineered flyable concrete baskets to control pour rates and reduce material waste
  • Custom foundation designs accounting for variable slope angles and bedrock conditions
Helicopter-Supported Construction
  • 100% helicopter access for all materials, equipment, and crew transport
  • Coordinated flight schedules to maintain construction productivity while minimizing overflight impacts
  • Flyable concrete basket system reduced costs and improved placement accuracy
Environmental & Regulatory Compliance
  • All work performed in compliance with National Park Service environmental standards
  • Minimized ground disturbance through air-access-only construction methodology
  • Coordination with PGE environmental teams for monitoring and reporting