
PGE Basin Creek Bridge Repair
Remote Northern California
Project Overview
Bridge Decking
125 ft
Man Crew
12
Emergency Response
Fire Damage
Project Duration
9/2025-11/2025
Completed
2025
Client
Pacific Gas and Electric Company
Location
Pine Flat Lake, Fresno County
Market
Services
Emergency Fire-Damaged Bridge Reconstruction & Structural Rehabilitation
Emergency bridge repair following damage sustained during the Garnet Fire. The scope included replacement of bridge decking, structural foundation repairs, and recoating of existing steel components. The remote location and elevated work environment required specialized planning and safety measures.

Full Scope of Work
Structural Repair
- Construction of new 125-foot bridge decking to replace fire-damaged structure
- Foundation repairs to restore structural integrity of existing supports
- Engineering review and documentation of all repaired structural elements
Steel Rehabilitation
- Recoating of existing bridge steel components for corrosion protection
- Surface preparation and application of protective coatings per specification
- Inspection and documentation of coating system for PGE records
Safety & Access
- Specialized rigging and fall protection systems for elevated work over water
- 12-person crew trained and equipped for remote high-angle work
- Remote location logistics including crew transport, equipment staging, and supply management







